Complete Drainage Solutions From Start To Finish

 
 

Photo Gallery

12 hours after a large rainfall event. You can clearly see the tile lines working already

  • 12 hours after a large rainfall event.  You can clearly see the tile lines working already.
  • Installing a main through a road
  • Installing a smooth wall main.
  • Why do we tile?  Because there's so much at stake
  • Working with a local contractor to build a sewage lagoon
  • Working on a new golf course
  • Installing the over the dike steel work for a large irrigation project
  • Moving some big heavy pipes into place
  • Coupling and backfilling a smooth wall main
  • Constructing a drain in a field
  • Irrigation reservoir construction
  • Using a sheepsfoot packer to pack in the clay liner on an irrigation reservoir
  • Depositing the clay material for the liner.
  • Our Case dozer that we use on various projects
  • Tile drainage lift station.  We typically use Carry Axial flow pumps
  • Stripping topsoil and making a nice size stockpile
  • Stripping topsoil for a development
  • Irrigation manifold that we installed.
  • Installing 18 inch irrigation line
  • Using our Case dozer to push out gravel for a parking lot.
  • Starting construction of a new reservoir
  • Installing tile.  The stringer tractor rolls out tile ahead of the plow
  • Our plow is a Wolfe 400 parallel link
  • In the trench putting together a smooth wall main
  • Using a dozer for backfilling and cleaning up
  • Our excavator, available for rent or hire